ITAC Assessment: SD0576
ITAC logo
ITAC Assessment: SD0576
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Aerospace manufacturing
NAICS 334220: Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 550
Plant Area 200,000
ft2
Annual Production 120,000,000
units
Production Hrs. Annual 7,344
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $366,724 5,395,158
kWh
Electricity Demand $386,370 14,448
kW-mo/yr
Electricity Fees $44,241 -
Natural Gas $10,686 1,476
MMBtu
TOTAL YEARLY COSTS $808,021
RECOMMENDED SAVINGS* $54,539 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $47,212

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $43,703 $57,500 $25,252
371,353
kWh
$18,451
-
kW-mo/yr
02 2.4231: Reduce the pressure of compressed air to the minimum required $4,047 $900 $4,047
59,520
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,280 $8,325 $1,997
29,365
kWh
$1,283
-
kW-mo/yr
04 2.4133: Use most efficient type of electric motors $2,774 $5,676 $1,688
24,830
kWh
$1,086
-
kW-mo/yr
05 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $587 $1,720 $587
8,626
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $148 $350 $105
1,543
kWh
$43
-
kW-mo/yr
TOTAL RECOMMENDED $54,539 $74,471 $33,676
495,237
kWh
$20,863
-
kW-mo/yr
TOTAL IMPLEMENTED $47,212 $65,246 $27,632
406,352
kWh
$19,580
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs