Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,546

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MA0815 #01 Y:2019 Use solar heat to make electricty $90,005 $373,605
GT0944 #08 Y:2019 Utilize energy-efficient belts and other improved mechanisms $456 $1,404
GT0944 #07 Y:2019 Install occupancy sensors $4,110 $3,531
GT0944 #06 Y:2019 Utilize higher efficiency lamps and/or ballasts $24,478 $20,506
GT0944 #05 Y:2019 Apply for tax-free status for energy purchases $9,591 $2,000
GT0944 #04 Y:2019 Reduce the pressure of compressed air to the minimum required $6,117 $1,000
GT0944 #03 Y:2019 Upgrade controls on compressors $47,317 $4,200
GT0944 #02 Y:2019 Reduce the pressure of compressed air to the minimum required $11,307 $300
GT0944 #01 Y:2019 Check for accuracy of utility / power meters $83,286 $2,000
UF0550 #05 Y:2019 Modify storage space to avoid rental of a warehouse $383,788 $897,972
UF0550 #04 Y:2019 Analyze flue gas for proper air/fuel ratio $2,928 $2,800
UF0550 #03 Y:2019 Install turbulators $3,921 $11,250
UF0550 #02 Y:2019 Use waste heat from hot flue gases to preheat incoming fluids $11,802 $30,000
UF0550 #01 Y:2019 Install adequate dryers on air lines to eliminate blowdown $41,888 $29,990
LE0493 #08 Y:2019 Replace existing hvac unit with high efficiency model $8,861 $42,000
LE0493 #07 Y:2019 Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $2,282 $10,500
LE0493 #06 Y:2019 Utilize higher efficiency lamps and/or ballasts $2,494 $9,550
LE0493 #05 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $2,371 $3,160
LE0493 #04 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $5,484 $4,000
LE0493 #03 Y:2019 Install timers and/or thermostats $1,943 $120