3,546
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MA0815 #01 Y:2019 | 01 | 2019 | Use solar heat to make electricty | $90,005 | $373,605 | |
| GT0944 #08 Y:2019 | 08 | 2019 | Utilize energy-efficient belts and other improved mechanisms | $456 | $1,404 | |
| GT0944 #07 Y:2019 | 07 | 2019 | Install occupancy sensors | $4,110 | $3,531 | |
| GT0944 #06 Y:2019 | 06 | 2019 | Utilize higher efficiency lamps and/or ballasts | $24,478 | $20,506 | |
| GT0944 #05 Y:2019 | 05 | 2019 | Apply for tax-free status for energy purchases | $9,591 | $2,000 | |
| GT0944 #04 Y:2019 | 04 | 2019 | Reduce the pressure of compressed air to the minimum required | $6,117 | $1,000 | |
| GT0944 #03 Y:2019 | 03 | 2019 | Upgrade controls on compressors | $47,317 | $4,200 | |
| GT0944 #02 Y:2019 | 02 | 2019 | Reduce the pressure of compressed air to the minimum required | $11,307 | $300 | |
| GT0944 #01 Y:2019 | 01 | 2019 | Check for accuracy of utility / power meters | $83,286 | $2,000 | |
| UF0550 #05 Y:2019 | 05 | 2019 | Modify storage space to avoid rental of a warehouse | $383,788 | $897,972 | |
| UF0550 #04 Y:2019 | 04 | 2019 | Analyze flue gas for proper air/fuel ratio | $2,928 | $2,800 | |
| UF0550 #03 Y:2019 | 03 | 2019 | Install turbulators | $3,921 | $11,250 | |
| UF0550 #02 Y:2019 | 02 | 2019 | Use waste heat from hot flue gases to preheat incoming fluids | $11,802 | $30,000 | |
| UF0550 #01 Y:2019 | 01 | 2019 | Install adequate dryers on air lines to eliminate blowdown | $41,888 | $29,990 | |
| LE0493 #08 Y:2019 | 08 | 2019 | Replace existing hvac unit with high efficiency model | $8,861 | $42,000 | |
| LE0493 #07 Y:2019 | 07 | 2019 | Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $2,282 | $10,500 | |
| LE0493 #06 Y:2019 | 06 | 2019 | Utilize higher efficiency lamps and/or ballasts | $2,494 | $9,550 | |
| LE0493 #05 Y:2019 | 05 | 2019 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,371 | $3,160 | |
| LE0493 #04 Y:2019 | 04 | 2019 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,484 | $4,000 | |
| LE0493 #03 Y:2019 | 03 | 2019 | Install timers and/or thermostats | $1,943 | $120 |