ITAC Assessment: UF0550
ITAC logo
ITAC Assessment: UF0550
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Soft Drinks
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 400,400
ft2
Annual Production 19,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,719,864 19,107,600
kWh
Natural Gas $108,465 19,438
MMBtu
Waste Disposal Costs
Water Usage $217,533 111,843
Tgal
Water Disposal $57,739 14,363
Tgal
TOTAL YEARLY COSTS $2,103,601
RECOMMENDED SAVINGS* $444,327 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $444,327

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings Primary Product Savings
01 2.4222: Install adequate dryers on air lines to eliminate blowdown $41,888 $29,990 $41,888
465,420
kWh
- - -
02 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $11,802 $30,000 - $11,802
-
MMBtu
- -
03 2.1222: Install turbulators $3,921 $11,250 - $3,921
-
MMBtu
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $2,928 $2,800 - $2,928
-
MMBtu
- -
05 4.522: Modify storage space to avoid rental of a warehouse $383,788 $897,972 $(-160,203.0)
(-1,780,030)
kWh
$(-9,490.0)
-
MMBtu
$(-2,509,019.0) $3,062,500
TOTAL RECOMMENDED $444,327 $972,012 $(-118,315.0)
(-1,314,610)
kWh
$9,161
-
MMBtu
$(-2,509,019.0) $3,062,500
TOTAL IMPLEMENTED $444,327 $972,012 $(-118,315.0)
(-1,314,610)
kWh
$9,161
-
MMBtu
$(-2,509,019.0) $3,062,500
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs