Assessment Year | 2020 |
---|---|
Principal Product | Soft Drinks |
NAICS | 312111: Soft Drink Manufacturing |
SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
Sales Range | $10 M to 50M |
# of Employees | 45 |
Plant Area |
400,400
ft2
|
Annual Production | 19,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $1,719,864 | 19,107,600 |
kWh
|
$0.090 | |
Natural Gas | $108,465 | 19,438 |
MMBtu
|
$5.58 | |
Waste Disposal Costs | |||||
Water Usage | $217,533 | 111,843 |
Tgal
|
$1.94 | |
Water Disposal | $57,739 | 14,363 |
Tgal
|
$4.02 | |
TOTAL YEARLY COSTS | $2,103,601 | ||||
RECOMMENDED SAVINGS* | $444,327 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $444,327 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4222: Install adequate dryers on air lines to eliminate blowdown | $41,888 | $29,990 |
$41,888
465,420
kWh
|
- | - | - | |
02 | 2.2427: Use waste heat from hot flue gases to preheat incoming fluids | $11,802 | $30,000 | - |
$11,802
-
MMBtu
|
- | - | |
03 | 2.1222: Install turbulators | $3,921 | $11,250 | - |
$3,921
-
MMBtu
|
- | - | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,928 | $2,800 | - |
$2,928
-
MMBtu
|
- | - | |
05 | 4.522: Modify storage space to avoid rental of a warehouse | $383,788 | $897,972 |
$(-160,203.0)
(-1,780,030)
kWh
|
$(-9,490.0)
-
MMBtu
|
$(-2,509,019.0) | $3,062,500 | |
TOTAL RECOMMENDED | $444,327 | $972,012 |
$(-118,315.0)
(-1,314,610)
kWh
|
$9,161
-
MMBtu
|
$(-2,509,019.0) | $3,062,500 | ||
TOTAL IMPLEMENTED | $444,327 | $972,012 |
$(-118,315.0)
(-1,314,610)
kWh
|
$9,161
-
MMBtu
|
$(-2,509,019.0) | $3,062,500 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs