ITAC Assessment: OK0533
ITAC logo
ITAC Assessment: OK0533
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Recycled Aluminum
NAICS
n/a
SIC 3341: Secondary Smelting and Refining of Nonferrous Metals
Sales Range $10
M
to 50
M
# of Employees 61
Plant Area 900,000
ft2
Annual Production 50,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $124,091 4,143,025
kWh
Electricity Demand $87,439 9,145
kW-mo/yr
Electricity Fees $2,628 -
Natural Gas $702,265 265,627
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,815 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,620

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings
01 4.423: Move product using mechanical means $22,960 $110,000 - - - - $22,960 -
02 2.2414: Use waste heat from hot flue gases to preheat $14,444 $17,000 - - $14,444
-
MMBtu
- - -
03 3.4114: Replace city water with recycled water via cooling tower $11,845 $8,350 - - $(-2,018.0)
-
MMBtu
$13,863
-
Tgal
- -
04 2.6218: Turn off equipment when not in use $3,426 - $7,808
288,101
kWh
$(-4,382.0)
-
kW-mo/yr
- - - -
05 3.5316: Contract a wood pallet recycling company $750 - - - - - - $750
06 2.7135: Install occupancy sensors $390 $660 $390
14,361
kWh
- - - - -
TOTAL RECOMMENDED $53,815 $136,010 $8,198
302,462
kWh
$(-4,382.0)
-
kW-mo/yr
$12,426
-
MMBtu
$13,863
-
Tgal
$22,960 $750
TOTAL IMPLEMENTED $18,620 $17,000 $7,808
288,101
kWh
$(-4,382.0)
-
kW-mo/yr
$14,444
-
MMBtu
- - $750
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs