ITAC Assessment: MA0815
ITAC logo
ITAC Assessment: MA0815
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Treated potable water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $5
M
to 10
M
# of Employees 22
Plant Area 26,436
ft2
Annual Production 1,102,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,622 542,400
kWh
Electricity Demand $10,766 1,805
kW-mo/yr
Electricity Fees $2,676 -
LPG $70,313 4,794
MMBtu
TOTAL YEARLY COSTS $155,377
RECOMMENDED SAVINGS* $150,968 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,271

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings One-time Revenue or Avoided Cost Savings
01 2.9114: Use solar heat to make electricty $90,005 $373,605 $57,422
435,017
kWh
$1,575
-
kW-mo/yr
- $31,008
02 2.3322: Use existing dam to generate electricity $33,419 $150,000 $32,059
242,869
kWh
$1,360
-
kW-mo/yr
- -
03 2.7221: Lower temperature during the winter season and vice-versa $11,675 $375 - - $11,675
-
MMBtu
-
04 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $8,358 $250 $188
1,424
kWh
- $8,170
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $5,596 $24,389 $4,898
37,105
kWh
$698
-
kW-mo/yr
- -
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,915 $250 - $1,915
-
kW-mo/yr
- -
TOTAL RECOMMENDED $150,968 $548,869 $94,567
716,415
kWh
$5,548
-
kW-mo/yr
$19,845
-
MMBtu
$31,008
TOTAL IMPLEMENTED $17,271 $24,764 $4,898
37,105
kWh
$698
-
kW-mo/yr
$11,675
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs