Assessment Year | 2006 |
---|---|
Principal Product | Aluminum organic chemicals |
NAICS | 325199: All Other Basic Organic Chemical Manufacturing |
SIC | 2869: Industrial Organic Chemicals, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 21 |
Plant Area |
20,168
ft2
|
Annual Production | 4,600,000,000
lb
|
Production Hrs. Annual | 7,344
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $59,925 | 891,800 |
kWh
|
$0.067 |
Electricity Demand | $8,049 | 1,845 |
kW-mo/yr
|
$4.36 |
Fuel Oil #2 | $122,291 | 10,878 |
MMBtu
|
$11.24 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $312,863 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $36,883 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Primary Raw Material Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.1224: Replace boiler | $115,080 | $223,000 | - | - |
$115,080
-
MMBtu
|
- | - | |
02 | 3.1172: Revise raw material specs | $106,250 | $60,000 | - | - | - | - | $106,250 | |
03 | 2.2113: Repair or replace steam traps | $26,312 | $16,000 | - | - |
$26,312
-
MMBtu
|
- | - | |
04 | 4.212: Adopt in-house material generation | $24,012 | $20,000 | - | - | - | $24,012 | - | |
05 | 2.2414: Use waste heat from hot flue gases to preheat | $23,245 | $15,000 | - | - |
$23,245
-
MMBtu
|
- | - | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $11,646 | $2,500 | - | - |
$11,646
-
MMBtu
|
- | - | |
07 | 2.2136: Install / repair insulation on steam lines | $1,225 | $1,152 | - | - |
$1,225
-
MMBtu
|
- | - | |
08 | 2.7135: Install occupancy sensors | $1,181 | $300 |
$1,181
17,626
kWh
|
- | - | - | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,912 | $3,722 |
$3,533
52,710
kWh
|
$379
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $312,863 | $341,674 |
$4,714
70,336
kWh
|
$379
-
kW-mo/yr
|
$177,508
-
MMBtu
|
$24,012 | $106,250 | ||
TOTAL IMPLEMENTED | $36,883 | $23,652 | - | - |
$12,871
-
MMBtu
|
$24,012 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Primary Raw Material Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs