ITAC Assessment: LE0493
ITAC logo
ITAC Assessment: LE0493
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Mechanical Shaft Seals
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3053: Gaskets, Packing, and Sealing Devices
Sales Range $50
M
to 100
M
# of Employees 60
Plant Area 80,000
ft2
Annual Production 50,000
units
Production Hrs. Annual 5,720
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $237,768 3,771,972
kWh
Electricity Demand $53,991 11,117
kW-mo/yr
Electricity Fees $9,288 -
Natural Gas $25,337 4,751
MMBtu
TOTAL YEARLY COSTS $326,384
RECOMMENDED SAVINGS* $31,053 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4226: Use / purchase optimum sized compressor $6,226 - $4,705
74,675
kWh
$1,521
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,392 $40 $1,198
19,020
kWh
$194
-
kW-mo/yr
-
03 2.7261: Install timers and/or thermostats $1,943 $120 $1,943
30,848
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,484 $4,000 $4,721
74,935
kWh
$763
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,371 $3,160 $388
6,160
kWh
$1,983
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,494 $9,550 $2,314
36,733
kWh
$180
-
kW-mo/yr
-
07 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $2,282 $10,500 $(-67.0)
(-1,067)
kWh
$(-87.5)
-
kW-mo/yr
$2,436
-
MMBtu
08 2.7232: Replace existing hvac unit with high efficiency model $8,861 $42,000 $7,311
116,052
kWh
$1,550
-
kW-mo/yr
-
TOTAL RECOMMENDED $31,053 $69,370 $22,513
357,356
kWh
$6,104
-
kW-mo/yr
$2,436
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs