Assessment Year | 2020 |
---|---|
Principal Product | Mechanical Shaft Seals |
NAICS | 336412: Aircraft Engine and Engine Parts Manufacturing |
SIC | 3053: Gaskets, Packing, and Sealing Devices |
Sales Range | $50 M to 100M |
# of Employees | 60 |
Plant Area |
80,000
ft2
|
Annual Production | 50,000
units
|
Production Hrs. Annual | 5,720
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $237,768 | 3,771,972 |
kWh
|
$0.063 |
Electricity Demand | $53,991 | 11,117 |
kW-mo/yr
|
$4.86 |
Electricity Fees | $9,288 | - |
|
- |
Natural Gas | $25,337 | 4,751 |
MMBtu
|
$5.33 |
TOTAL YEARLY COSTS | $326,384 | |||
RECOMMENDED SAVINGS* | $31,053 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4226: Use / purchase optimum sized compressor | $6,226 | - |
$4,705
74,675
kWh
|
$1,521
-
kW-mo/yr
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,392 | $40 |
$1,198
19,020
kWh
|
$194
-
kW-mo/yr
|
- | |
03 | 2.7261: Install timers and/or thermostats | $1,943 | $120 |
$1,943
30,848
kWh
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,484 | $4,000 |
$4,721
74,935
kWh
|
$763
-
kW-mo/yr
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,371 | $3,160 |
$388
6,160
kWh
|
$1,983
-
kW-mo/yr
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,494 | $9,550 |
$2,314
36,733
kWh
|
$180
-
kW-mo/yr
|
- | |
07 | 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $2,282 | $10,500 |
$(-67.0)
(-1,067)
kWh
|
$(-87.5)
-
kW-mo/yr
|
$2,436
-
MMBtu
|
|
08 | 2.7232: Replace existing hvac unit with high efficiency model | $8,861 | $42,000 |
$7,311
116,052
kWh
|
$1,550
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $31,053 | $69,370 |
$22,513
357,356
kWh
|
$6,104
-
kW-mo/yr
|
$2,436
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs