ITAC Assessment: OK0775
ITAC logo
ITAC Assessment: OK0775
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Powdered Metal Parts
NAICS 332117: Powder Metallurgy Part Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 71
Plant Area 65,000
ft2
Annual Production 8,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $306,828 5,317,840
kWh
Electricity Demand $87,895 10,644
kW-mo/yr
Natural Gas $23,549 1,984
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $77,815 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,248

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,182 - $4,182
72,600
kWh
- -
02 2.4221: Install compressor air intakes in coolest locations $2,161 $2,326 $2,161
37,515
kWh
- -
03 2.2437: Recover waste heat from equipment $6,617 $5,534 - - $6,617
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,208 $11,677 $1,208
18,018
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,179 $9,264 $2,179
40,361
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,586 $4,119 $1,586
35,718
kWh
- -
07 2.1121: Use insulation in furnaces to facilitate heating / cooling $5,419 $386 $5,419
94,080
kWh
- -
08 2.3137: Use power during off-peak periods $30,940 - - $30,940
-
kW-mo/yr
-
09 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $19,665 $140,000 $19,665
336,960
kWh
- -
10 2.7261: Install timers and/or thermostats $3,858 $2,925 - - $3,858
-
MMBtu
TOTAL RECOMMENDED $77,815 $176,231 $36,400
635,252
kWh
$30,940
-
kW-mo/yr
$10,475
-
MMBtu
TOTAL IMPLEMENTED $9,248 $14,602 $5,390
90,618
kWh
- $3,858
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs