Assessment Year | 2020 |
---|---|
Principal Product | Tamper Evident, Track and Trace Security Seals |
NAICS | 339991: Gasket, Packing, and Sealing Device Manufacturing |
SIC | 3053: Gaskets, Packing, and Sealing Devices |
Sales Range | $10 M to 50M |
# of Employees | 240 |
Plant Area |
150,000
ft2
|
Annual Production | 444,566,481
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $957,222 | 12,942,076 |
kWh
|
$0.074 |
TOTAL YEARLY COSTS | $957,222 | |||
RECOMMENDED SAVINGS* | $186,662 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $164,672 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|
01 | 2.8118: Check for accuracy of utility / power meters | $83,286 | $2,000 | - | $83,286 | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $11,307 | $300 |
$11,307
152,796
kWh
|
- | |
03 | 2.4224: Upgrade controls on compressors | $47,317 | $4,200 |
$47,317
639,418
kWh
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,117 | $1,000 |
$6,117
82,656
kWh
|
- | |
05 | 2.8121: Apply for tax-free status for energy purchases | $9,591 | $2,000 | - | $9,591 | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $24,478 | $20,506 |
$24,478
330,786
kWh
|
- | |
07 | 2.7135: Install occupancy sensors | $4,110 | $3,531 |
$4,110
55,542
kWh
|
- | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $456 | $1,404 |
$456
6,162
kWh
|
- | |
TOTAL RECOMMENDED | $186,662 | $34,941 |
$93,785
1,267,360
kWh
|
$92,877 | ||
TOTAL IMPLEMENTED | $164,672 | $28,706 |
$71,795
970,204
kWh
|
$92,877 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs