ITAC Assessment: TN0664
ITAC logo
ITAC Assessment: TN0664
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Men's and Boys' Denim Jeans and Shorts
NAICS
n/a
SIC 2325: Men's and Boys' Separate Trousers and Slacks
Sales Range $10
M
to 50
M
# of Employees 201
Plant Area 84,000
ft2
Annual Production 1,250,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,049 1,133,646
kWh
Electricity Demand $16,895 4,012
kW-mo/yr
Electricity Fees $6,304 -
Natural Gas $9,047 1,705
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $113,947 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $78,900

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 3.5311: Recover and reuse waste material $11,400 $2,800 - $11,400
-
lb
- -
02 2.7144: Install spectral reflectors / delamp $2,574 $7,230 $2,320
85,873
kWh
$254
-
lb
- -
03 2.2437: Recover waste heat from equipment $473 $825 $473
24,619
kWh
- - -
04 4.421: Modify current incentive program $67,500 $16,375 - - - $67,500
05 4.112: Replace old machine with new automatic multi-station tool $32,000 $78,250 - - $32,000 -
TOTAL RECOMMENDED $113,947 $105,480 $2,793
110,492
kWh
$11,654
-
lb
$32,000 $67,500
TOTAL IMPLEMENTED $78,900 $19,175 - $11,400
-
lb
- $67,500
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs