Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

956

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT0208 #06 Y:1983 Enhance sensitivity of temperature control and cutoff $18,300 $20,000
GT0208 #05 Y:1983 Redesign process $10,210 $20,000
GT0208 #04 Y:1983 Turn off equipment during breaks, reduce operating time $1,720 -
GT0208 #03 Y:1983 Utilize higher efficiency lamps and/or ballasts $4,580 $5,660
GT0208 #02 Y:1983 Use most efficient type of electric motors $6,482 $6,948
GT0208 #01 Y:1983 Analyze flue gas for proper air/fuel ratio $5,150 $1,550
GT0206 #04 Y:1983 Insulate bare equipment $5,168 $6,540
GT0206 #03 Y:1983 Preheat boiler makeup water with waste process heat $14,224 $9,000
GT0206 #02 Y:1983 Use heat from boiler blowdown to preheat boiler feed water $8,580 $4,500
GT0206 #01 Y:1983 Analyze flue gas for proper air/fuel ratio $6,815 $200
TN0198 #05 Y:1983 Repair and eliminate steam leaks $168 $183
TN0198 #04 Y:1983 Analyze flue gas for proper air/fuel ratio - $108
TN0198 #03 Y:1983 Use minimum steam operating pressure $257 -
TN0198 #02 Y:1983 Install / repair insulation on steam lines $442 $589
TN0198 #01 Y:1983 Insulate bare equipment $3,850 $2,583
UD0112 #06 Y:1983 Install timers and/or thermostats $5,475 $1,160
UD0112 #05 Y:1983 Re-use or recycle hot or cold process exhaust air $6,913 $5,000
UD0112 #04 Y:1983 Utilize higher efficiency lamps and/or ballasts $6,427 $8,505
UD0112 #03 Y:1983 Redesign process $4,152 $1,200
UD0112 #02 Y:1983 Replace broken windows and/or window sash $18,921 $21,000