ITAC Assessment: GT0206
ITAC logo
ITAC Assessment: GT0206
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product YARN DYEING
NAICS
n/a
SIC 2269: Finishers of Textiles, Not elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 16
Plant Area
n/a
Annual Production 4,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $143,438 2,994,138
kWh
Natural Gas $188,553 39,800
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,787 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,619

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $6,815 $200 $6,815
-
MMBtu
02 2.1243: Use heat from boiler blowdown to preheat boiler feed water $8,580 $4,500 $8,580
-
MMBtu
03 2.2441: Preheat boiler makeup water with waste process heat $14,224 $9,000 $14,224
-
MMBtu
04 2.2511: Insulate bare equipment $5,168 $6,540 $5,168
-
MMBtu
TOTAL RECOMMENDED $34,787 $20,240 $34,787
-
MMBtu
TOTAL IMPLEMENTED $29,619 $13,700 $29,619
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs