ITAC Assessment: GT0208
ITAC logo
ITAC Assessment: GT0208
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product COTTON & SYNTHETIC YARN
NAICS
n/a
SIC 2281: Yarn Spinning Mills
Sales Range $10
M
to 50
M
# of Employees 334
Plant Area
n/a
Annual Production 15,800,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $753,045 15,716,882
kWh
Natural Gas $80,836 16,810
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,442 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,442

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $5,150 $1,550 - $5,150
-
MMBtu
02 2.4133: Use most efficient type of electric motors $6,482 $6,948 $6,482
137,163
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,580 $5,660 $4,580
96,717
kWh
-
04 2.6212: Turn off equipment during breaks, reduce operating time $1,720 - $1,720
35,170
kWh
-
05 2.5194: Redesign process $10,210 $20,000 $10,210
325,322
kWh
-
06 2.2223: Enhance sensitivity of temperature control and cutoff $18,300 $20,000 $18,300
583,236
kWh
-
TOTAL RECOMMENDED $46,442 $54,158 $41,292
1,177,608
kWh
$5,150
-
MMBtu
TOTAL IMPLEMENTED $46,442 $54,158 $41,292
1,177,608
kWh
$5,150
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs