Assessment Year | 1984 |
---|---|
Principal Product | MANHOLES |
NAICS |
n/a
|
SIC | 3272: Concrete Products, Except Block and Brick |
Sales Range | $1 M to 5M |
# of Employees | 15 |
Plant Area |
n/a
|
Annual Production | 10,000
ton
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $12,147 | 170,281 |
kWh
|
$0.071 |
Natural Gas | $9,599 | 1,718 |
MMBtu
|
$5.59 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $4,717 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,717 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $3,850 | $2,583 |
$3,850
-
MMBtu
|
- | |
02 | 2.2136: Install / repair insulation on steam lines | $442 | $589 |
$442
-
MMBtu
|
- | |
03 | 2.2163: Use minimum steam operating pressure | $257 | - |
$257
-
MMBtu
|
- | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | - | $108 |
$200
-
MMBtu
|
$(-200.0) | |
05 | 2.2135: Repair and eliminate steam leaks | $168 | $183 |
$168
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $4,717 | $3,463 |
$4,917
-
MMBtu
|
$(-200.0) | ||
TOTAL IMPLEMENTED | $4,717 | $3,463 |
$4,917
-
MMBtu
|
$(-200.0) |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs