Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product MANHOLES
NAICS
n/a
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $1
M
to 5
M
# of Employees 15
Plant Area
n/a
Annual Production 10,000
ton
Production Hrs. Annual 2,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $12,147 170,281
kWh
Natural Gas $9,599 1,718
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,717 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,717

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Natural Gas Savings Administrative Changes Savings
01 2.2511: Insulate bare equipment $3,850 $2,583 $3,850
-
MMBtu
-
02 2.2136: Install / repair insulation on steam lines $442 $589 $442
-
MMBtu
-
03 2.2163: Use minimum steam operating pressure $257 - $257
-
MMBtu
-
04 2.1233: Analyze flue gas for proper air/fuel ratio - $108 $200
-
MMBtu
$(-200.0)
05 2.2135: Repair and eliminate steam leaks $168 $183 $168
-
MMBtu
-
TOTAL RECOMMENDED $4,717 $3,463 $4,917
-
MMBtu
$(-200.0)
TOTAL IMPLEMENTED $4,717 $3,463 $4,917
-
MMBtu
$(-200.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs