ITAC Assessment: UD0112
ITAC logo
ITAC Assessment: UD0112
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product ADHESIVE,CAULKS
NAICS
n/a
SIC 2891: Adhesives and Sealants
Sales Range $10
M
to 50
M
# of Employees 360
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 8,600
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $439,918 8,571,806
kWh
Natural Gas $269,115 49,009
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,924 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $41,297

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $9,036 $800 - $9,036
-
MMBtu
02 2.7441: Replace broken windows and/or window sash $18,921 $21,000 - $18,921
-
MMBtu
03 2.5194: Redesign process $4,152 $1,200 $4,152
72,392
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,427 $8,505 $8,021
131,301
kWh
$(-1,594.0)
-
MMBtu
05 2.2443: Re-use or recycle hot or cold process exhaust air $6,913 $5,000 $(-251.0)
(-4,982)
kWh
$7,164
-
MMBtu
06 2.7261: Install timers and/or thermostats $5,475 $1,160 $1,588
39,566
kWh
$3,887
-
MMBtu
TOTAL RECOMMENDED $50,924 $37,665 $13,510
238,277
kWh
$37,414
-
MMBtu
TOTAL IMPLEMENTED $41,297 $35,305 $7,770
126,319
kWh
$33,527
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs