167,378
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UA0304 #05 Y:2025 | 05 | 2025 | Reduce illumination to minimum necessary levels | $3,604 | $1,012 |
n/a
|
| UA0304 #04 Y:2025 | 04 | 2025 | Use solar heat to make electricty | $122,315 | $1,809,180 |
n/a
|
| UA0304 #03 Y:2025 | 03 | 2025 | Install compressor air intakes in coolest locations | $4,897 | $8,397 |
n/a
|
| UA0304 #02 Y:2025 | 02 | 2025 | Use proper thickness of insulation on building envelope | $6,154 | $51,120 |
n/a
|
| UA0304 #01 Y:2025 | 01 | 2025 | Replace existing hvac unit with high efficiency model | $53,957 | $247,000 |
n/a
|
| LE0607 #08 Y:2025 | 08 | 2025 | Use solar heat to heat water | $77,719 | $482,154 |
n/a
|
| LE0607 #07 Y:2025 | 07 | 2025 | Preheat combustion air with waste heat | $4,764 | $10,000 |
n/a
|
| LE0607 #06 Y:2025 | 06 | 2025 | Repair or replace steam traps | $3,892 | $4,700 |
n/a
|
| LE0607 #05 Y:2025 | 05 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $24,953 | $13,000 |
n/a
|
| LE0607 #04 Y:2025 | 04 | 2025 | Upgrade obsolete equipment | $833,198 | $400,000 |
n/a
|
| LE0607 #03 Y:2025 | 03 | 2025 | Re-arrange equipment layout to reduce handling costs | $1,005,000 | $300,000 |
n/a
|
| LE0607 #02 Y:2025 | 02 | 2025 | Use / purchase optimum sized compressor | $138,699 | $35,000 |
n/a
|
| LE0607 #01 Y:2025 | 01 | 2025 | Reduce the pressure of compressed air to the minimum required | $2,048 | - |
n/a
|
| MZ0390 #08 Y:2025 | 08 | 2025 | Use or replace with energy efficient substitutes | $2,878 | $1,700 |
n/a
|
| MZ0390 #07 Y:2025 | 07 | 2025 | Install occupancy sensors | $196 | $725 |
n/a
|
| MZ0390 #06 Y:2025 | 06 | 2025 | Reduce the pressure of compressed air to the minimum required | $3,595 | $1,000 |
n/a
|
| MZ0390 #05 Y:2025 | 05 | 2025 | Use waste heat from hot flue gases to preheat incoming fluids | $11,755 | $46,600 |
n/a
|
| MZ0390 #04 Y:2025 | 04 | 2025 | Analyze flue gas for proper air/fuel ratio | $7,996 | $1,600 |
n/a
|
| MZ0390 #03 Y:2025 | 03 | 2025 | Chill water to the highest temperature possible | $9,218 | $13,460 |
n/a
|
| MZ0390 #02 Y:2025 | 02 | 2025 | Chill water to the highest temperature possible | $8,616 | $19,492 |
n/a
|