ITAC Assessment: IC0341
ITAC logo
ITAC Assessment: IC0341
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Heat Treatment/Bar Processing
NAICS 332811: Metal Heat Treating
SIC 3398: Metal Heat Treating
Sales Range $1
M
to 5
M
# of Employees 34
Plant Area 255,000
ft2
Annual Production 2,600
ton
Production Hrs. Annual 4,992
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $241,838 2,669,008
kWh
Electricity Demand $175,594 10,110
kW-mo/yr
Electricity Fees $57,873 -
Natural Gas $413,450 96,365
MMBtu
Other Gas $129,352 1
MMBtu
TOTAL YEARLY COSTS $1,018,108
RECOMMENDED SAVINGS* $91,136 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $30,000 $112,624 - $30,000
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $629 $2,060 $460
5,059
kWh
$169
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $540 $282 $376
4,133
kWh
$164
-
kW-mo/yr
-
04 2.4221: Install compressor air intakes in coolest locations $445 $760 $245
2,688
kWh
$201
-
kW-mo/yr
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $45,344 $21,031 $31,082
341,565
kWh
$14,262
-
kW-mo/yr
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,850 $26,620 $4,430
48,684
kWh
$1,419
-
kW-mo/yr
-
07 2.1121: Use insulation in furnaces to facilitate heating / cooling $5,148 $20,800 - - $5,148
-
MMBtu
08 2.7142: Utilize higher efficiency lamps and/or ballasts $3,180 $732 $2,167
23,822
kWh
$1,013
-
kW-mo/yr
-
TOTAL RECOMMENDED $91,136 $184,909 $38,761
425,952
kWh
$47,228
-
kW-mo/yr
$5,148
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs