| Assessment Year | 2026 |
|---|---|
| Principal Product | Truck Seats |
| NAICS | 336360: Motor Vehicle Seating and Interior Trim Manufacturing |
| SIC | 3714: Motor Vehicle Parts and Accessories |
| Sales Range | $100 M to 500M |
| # of Employees | 610 |
| Plant Area |
293,350
ft2
|
| Annual Production | 1,440,000
units
|
| Production Hrs. Annual | 6,912
hrs
|
| Location (State) | Nebraska |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $1,012,126 | 15,368,400 |
kWh
|
$0.066 | |
| Natural Gas | $577,650 | 132,515 |
MMBtu
|
$4.36 | |
| Other Gas | $28,789 | 1 |
MMBtu
|
$28,789.00 | |
| Waste Disposal Costs | |||||
| Water Usage | $48,827 | 16,176 |
Tgal
|
$3.02 | |
| Water Disposal | $136,986 | 17,832 |
Tgal
|
$7.68 | |
| Other Liquid (non-haz) | $7,893 | 1 |
gal
|
$7,893.00 | |
| TOTAL YEARLY COSTS | $1,812,271 | ||||
| RECOMMENDED SAVINGS* | $193,281 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 3.7392: Apply a protective coating to racks and tanks | $103,072 | $2,040 |
$(-428.0)
(-6,480)
kWh
|
- | - | - | - | - | $3,500 | $100,000 | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $41,428 | $20,000 |
$42,200
639,401
kWh
|
- | - | - | $(-672.0) | $(-100.0) | - | - | |
| 03 | 3.4155: Meter waste water | $18,726 | $15,000 | - | - |
$5,028
-
Tgal
|
$13,698
-
Tgal
|
- | - | - | - | |
| 04 | 2.7229: Air condition only space necessary | $13,467 | $7,019 | - |
$13,467
-
MMBtu
|
- | - | - | - | - | - | |
| 05 | 2.2211: Use optimum temperature | $12,756 | $40,000 | - |
$12,756
-
MMBtu
|
- | - | - | - | - | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,832 | $3,600 |
$3,832
58,061
kWh
|
- | - | - | - | - | - | - | |
| TOTAL RECOMMENDED | $193,281 | $87,659 |
$45,604
690,982
kWh
|
$26,223
-
MMBtu
|
$5,028
-
Tgal
|
$13,698
-
Tgal
|
$(-672.0) | $(-100.0) | $3,500 | $100,000 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs