ITAC Assessment: NL0128
ITAC logo
ITAC Assessment: NL0128
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Truck Seats
NAICS 336360: Motor Vehicle Seating and Interior Trim Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 610
Plant Area 293,350
ft2
Annual Production 1,440,000
units
Production Hrs. Annual 6,912
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,012,126 15,368,400
kWh
Natural Gas $577,650 132,515
MMBtu
Other Gas $28,789 1
MMBtu
Waste Disposal Costs
Water Usage $48,827 16,176
Tgal
Water Disposal $136,986 17,832
Tgal
Other Liquid (non-haz) $7,893 1
gal
TOTAL YEARLY COSTS $1,812,271
RECOMMENDED SAVINGS* $193,281 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
01 3.7392: Apply a protective coating to racks and tanks $103,072 $2,040 $(-428.0)
(-6,480)
kWh
- - - - - $3,500 $100,000
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $41,428 $20,000 $42,200
639,401
kWh
- - - $(-672.0) $(-100.0) - -
03 3.4155: Meter waste water $18,726 $15,000 - - $5,028
-
Tgal
$13,698
-
Tgal
- - - -
04 2.7229: Air condition only space necessary $13,467 $7,019 - $13,467
-
MMBtu
- - - - - -
05 2.2211: Use optimum temperature $12,756 $40,000 - $12,756
-
MMBtu
- - - - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,832 $3,600 $3,832
58,061
kWh
- - - - - - -
TOTAL RECOMMENDED $193,281 $87,659 $45,604
690,982
kWh
$26,223
-
MMBtu
$5,028
-
Tgal
$13,698
-
Tgal
$(-672.0) $(-100.0) $3,500 $100,000
TOTAL IMPLEMENTED - - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs