Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

167,802

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NC0053 #02 Y:1995 Utilize daylight whenever possible in lieu of artificial light $161 $150
NC0053 #01 Y:1995 Utilize higher efficiency lamps and/or ballasts $1,554 $476
IA0112 #08 Y:1995 Eliminate or reduce compressed air usage $1,454 $3,000
IA0112 #07 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $3,119 $325
IA0112 #06 Y:1995 Install compressor air intakes in coolest locations $3,463 $500
IA0112 #05 Y:1995 Utilize higher efficiency lamps and/or ballasts $1,490 $951
IA0112 #04 Y:1995 Utilize higher efficiency lamps and/or ballasts $4,062 $9,608
IA0112 #03 Y:1995 Turn off equipment when not in use $8,978 $50
IA0112 #02 Y:1995 Cover open tanks $12,802 $5,018
IA0112 #01 Y:1995 Shut off pilots in standby equipment $38,404 $325
GT0553 #06 Y:1995 Utilize higher efficiency lamps and/or ballasts $3,590 $7,720
GT0553 #05 Y:1995 Use most efficient type of electric motors $1,018 $4,100
GT0553 #04 Y:1995 Isolate hot or cold equipment $6,865 $2,560
GT0553 #03 Y:1995 Modify refrigeration system to operate at a lower pressure $22,120 $36,400
GT0553 #02 Y:1995 Change rate schedules or other changes in utility service $68,015 -
GT0553 #01 Y:1995 Purchase gas directly from a contract gas supplier $85,560 $85,000
UF0117 #07 Y:1995 Use synthetic lubricant $255 -
UF0117 #06 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $326 $100
UF0117 #05 Y:1995 Replace existing hvac unit with high efficiency model $19,074 $31,700
UF0117 #04 Y:1995 Utilize higher efficiency lamps and/or ballasts $763 $1,160