ITAC Assessment: NC0053
ITAC logo
ITAC Assessment: NC0053
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Woven Narrow Fabrics
NAICS
n/a
SIC 2241: Narrow Fabric and Other Smallware Mills: Cotton, Wool, Silk, and Manmade Fiber
Sales Range $1
M
to 5
M
# of Employees 37
Plant Area 36,500
ft2
Annual Production 2,400
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $42,198 631,008
kWh
Fuel Oil #2 $11,550 2,940
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,751 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,364

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #1 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,554 $476 $1,554
23,154
kWh
-
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $161 $150 $161
2,638
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $833 $2,100 $833
4,396
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $495 $150 $495
7,327
kWh
-
05 2.4133: Use most efficient type of electric motors $3,991 $3,790 $3,991
59,496
kWh
-
06 2.2511: Insulate bare equipment $1,717 $248 - $1,717
-
MMBtu
TOTAL RECOMMENDED $8,751 $6,914 $7,034
97,011
kWh
$1,717
-
MMBtu
TOTAL IMPLEMENTED $6,364 $4,338 $4,647
69,461
kWh
$1,717
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #1 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs