Assessment Year | 2000 |
---|---|
Principal Product | Oil Processing Catalysts and Adsorbents |
NAICS |
n/a
|
SIC | 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 52 |
Plant Area |
95,000
ft2
|
Annual Production | 11,000
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $333,930 | 11,837,339 |
kWh
|
$0.028 |
Electricity Demand | $263,599 | 23,258 |
kW-mo/yr
|
$11.33 |
Natural Gas | $711,597 | 212,141 |
MMBtu
|
$3.35 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $194,819 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $181,239 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $12,065 | $11,950 | - |
$12,065
-
kW-mo/yr
|
- | - | |
02 | 2.4133: Use most efficient type of electric motors | $1,251 | $1,567 |
$716
25,498
kWh
|
$535
-
kW-mo/yr
|
- | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,515 | - |
$975
34,584
kWh
|
$540
-
kW-mo/yr
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $492 | $1,426 |
$264
9,379
kWh
|
$228
-
kW-mo/yr
|
- | - | |
05 | 2.2414: Use waste heat from hot flue gases to preheat | $19,496 | $24,000 | - | - |
$19,496
-
MMBtu
|
- | |
06 | 4.111: Add equipment/ operators to reduce production bottleneck | $160,000 | $45,600 | - | - | - | $160,000 | |
TOTAL RECOMMENDED | $194,819 | $84,543 |
$1,955
69,461
kWh
|
$13,368
-
kW-mo/yr
|
$19,496
-
MMBtu
|
$160,000 | ||
TOTAL IMPLEMENTED | $181,239 | $72,593 |
$980
34,877
kWh
|
$763
-
kW-mo/yr
|
$19,496
-
MMBtu
|
$160,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs