ITAC Assessment: AR0192
ITAC logo
ITAC Assessment: AR0192
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Oil Processing Catalysts and Adsorbents
NAICS
n/a
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 52
Plant Area 95,000
ft2
Annual Production 11,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $333,930 11,837,339
kWh
Electricity Demand $263,599 23,258
kW-mo/yr
Natural Gas $711,597 212,141
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $194,819 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $181,239

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Primary Product Savings
01 2.3212: Optimize plant power factor $12,065 $11,950 - $12,065
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $1,251 $1,567 $716
25,498
kWh
$535
-
kW-mo/yr
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,515 - $975
34,584
kWh
$540
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $492 $1,426 $264
9,379
kWh
$228
-
kW-mo/yr
- -
05 2.2414: Use waste heat from hot flue gases to preheat $19,496 $24,000 - - $19,496
-
MMBtu
-
06 4.111: Add equipment/ operators to reduce production bottleneck $160,000 $45,600 - - - $160,000
TOTAL RECOMMENDED $194,819 $84,543 $1,955
69,461
kWh
$13,368
-
kW-mo/yr
$19,496
-
MMBtu
$160,000
TOTAL IMPLEMENTED $181,239 $72,593 $980
34,877
kWh
$763
-
kW-mo/yr
$19,496
-
MMBtu
$160,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs