ITAC Assessment: MZ0342
ITAC logo
ITAC Assessment: MZ0342
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Billboard banners
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 55
Plant Area 38,000
ft2
Annual Production 85,000
pieces
Production Hrs. Annual 5,040
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,424 677,440
kWh
Natural Gas $13,806 1,405
MMBtu
LPG $2,048 61
MMBtu
Waste Disposal Costs
Water Usage $3,931 207
Tgal
TOTAL YEARLY COSTS $101,209
RECOMMENDED SAVINGS* $10,456 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,866

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings One-time Revenue or Avoided Cost Savings
01 2.4239: Eliminate or reduce compressed air usage $433 $220 $433
3,613
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $157 $80 $157
1,297
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $570 $120 $570
4,724
kWh
-
04 2.7135: Install occupancy sensors $5,030 $3,700 $5,030
41,916
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,266 $5,828 $3,138
26,151
kWh
$1,128
TOTAL RECOMMENDED $10,456 $9,948 $9,328
77,701
kWh
$1,128
TOTAL IMPLEMENTED $9,866 $9,648 $8,738
72,791
kWh
$1,128
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs