Assessment Year | 1990 |
---|---|
Principal Product | DOORLOCKS & HARDWARE |
NAICS |
n/a
|
SIC | 3429: Hardware, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 503 |
Plant Area |
n/a
|
Annual Production | 1,800,000
pieces
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $358,567 | 6,505,862 |
kWh
|
$0.055 |
Natural Gas | $185,425 | 35,081 |
MMBtu
|
$5.29 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $80,321 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $78,593 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7123: Keep lamps and reflectors clean | $31,973 | $43,388 |
$29,450
535,463
kWh
|
- | $2,523 | |
02 | 2.7261: Install timers and/or thermostats | $14,470 | $1,335 |
$5,497
99,941
kWh
|
$8,973
-
MMBtu
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $17,393 | $1,230 |
$17,393
316,237
kWh
|
- | - | |
04 | 2.2153: Close off unneeded steam lines | $4,993 | - | - |
$4,993
-
MMBtu
|
- | |
05 | 2.2135: Repair and eliminate steam leaks | $2,480 | $1,050 | - |
$2,480
-
MMBtu
|
- | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,998 | $1,000 | - |
$1,998
-
MMBtu
|
- | |
07 | 2.2511: Insulate bare equipment | $1,728 | $985 | - |
$1,728
-
MMBtu
|
- | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,788 | $2,100 |
$4,788
87,046
kWh
|
- | - | |
09 | 2.2136: Install / repair insulation on steam lines | $498 | $138 | - |
$498
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $80,321 | $51,226 |
$57,128
1,038,687
kWh
|
$20,670
-
MMBtu
|
$2,523 | ||
TOTAL IMPLEMENTED | $78,593 | $50,241 |
$57,128
1,038,687
kWh
|
$18,942
-
MMBtu
|
$2,523 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs