ITAC Assessment: OR0763
ITAC logo
ITAC Assessment: OR0763
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Cider, wine
NAICS 312130: Wineries
SIC 2084: Wines, Brandy, and Brandy Spirits
Sales Range $10
M
to 50
M
# of Employees 98
Plant Area 30,000
ft2
Annual Production 2,400
Tgal
Production Hrs. Annual 3,650
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $77,788 1,575,920
kWh
Electricity Demand $48,511 4,782
kW-mo/yr
Electricity Fees $16,704 -
Natural Gas $56,330 6,238
MMBtu
Waste Disposal Costs
Water Usage $71,335 7,151
Tgal
Gaseous Waste $210,000 1,187,378
lb
TOTAL YEARLY COSTS $480,668
RECOMMENDED SAVINGS* $185,489 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Gaseous Waste Savings
01 4.212: Adopt in-house material generation $172,258 $46,346 - - $172,258
-
lb
02 2.2511: Insulate bare equipment $5,819 $13,838 $4,656
94,585
kWh
$1,163
-
kW-mo/yr
-
03 2.9114: Use solar heat to make electricty $7,412 $89,663 $6,421
97,282
kWh
$991
-
kW-mo/yr
-
TOTAL RECOMMENDED $185,489 $149,847 $11,077
191,867
kWh
$2,154
-
kW-mo/yr
$172,258
-
lb
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs