ITAC Assessment: GT0553
ITAC logo
ITAC Assessment: GT0553
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Marshmallow Pies
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $50
M
to 100
M
# of Employees 222
Plant Area 162,000
ft2
Annual Production 50,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $332,398 6,048,945
kWh
Natural Gas $204,013 35,375
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $187,168 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.8113: Purchase gas directly from a contract gas supplier $85,560 $85,000 - $85,560
02 2.8114: Change rate schedules or other changes in utility service $68,015 - - $68,015
03 2.2621: Modify refrigeration system to operate at a lower pressure $22,120 $36,400 $22,120
477,140
kWh
-
04 2.2522: Isolate hot or cold equipment $6,865 $2,560 $6,865
32,825
kWh
-
05 2.4133: Use most efficient type of electric motors $1,018 $4,100 $1,018
4,982
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,590 $7,720 $3,590
77,667
kWh
-
TOTAL RECOMMENDED $187,168 $135,780 $33,593
592,614
kWh
$153,575
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs