ITAC Assessment: BD0158
ITAC logo
ITAC Assessment: BD0158
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Multi- wall Paper bags
NAICS
n/a
SIC 2674: Uncoated Paper and Multiwall Bags
Sales Range $10
M
to 50
M
# of Employees 236
Plant Area 287,300
ft2
Annual Production 64,800,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $252,554 4,442,849
kWh
Electricity Demand $18,979 7,617
kW-mo/yr
Electricity Fees $(-3,295.0) -
Natural Gas $114,878 27,632
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $670,278 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $634,329

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Increase in Production Savings
01 2.1221: Replace obsolete burners with more efficient ones $17,993 $20,000 - $17,993
-
MMBtu
- - -
02 2.7135: Install occupancy sensors $4,276 $1,650 $4,276
70,340
kWh
- - - -
03 2.1123: Install automatic stack damper $1,929 $3,000 - $1,929
-
MMBtu
- - -
04 4.431: Train operators for maximum operating efficiency $13,680 $5,000 - - $13,680 - -
05 3.5316: Contract a wood pallet recycling company $600 $240 - - - $600 -
06 4.322: Eliminate old stock and modify inventory control $631,800 $50,000 - - - - $631,800
TOTAL RECOMMENDED $670,278 $79,890 $4,276
70,340
kWh
$19,922
-
MMBtu
$13,680 $600 $631,800
TOTAL IMPLEMENTED $634,329 $53,240 - $1,929
-
MMBtu
- $600 $631,800
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs