ITAC Assessment: SD0048
ITAC logo
ITAC Assessment: SD0048
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product COMPOSITE MATERIALS
NAICS
n/a
SIC 3083: Laminated Plastics Plate, Sheet, and Profile Shapes
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area
n/a
Annual Production 3,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $415,315 4,206,624
kWh
Natural Gas $261,331 51,825
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $115,057 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,426

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $1,294 $1,103 $1,294
13,189
kWh
-
02 2.2628: Utilize a less expensive cooling method $82,299 $143,700 $82,299
1,086,753
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,491 - $2,711
27,550
kWh
$(-220.0)
04 2.7144: Install spectral reflectors / delamp $18,758 $17,100 $16,041
162,368
kWh
$2,717
05 2.6232: Install set-back timers $4,596 $5,840 $4,032
40,739
kWh
$564
06 2.6232: Install set-back timers $3,841 $1,600 $3,453
34,877
kWh
$388
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,778 - $2,300
23,447
kWh
$(-522.0)
TOTAL RECOMMENDED $115,057 $169,343 $112,130
1,388,923
kWh
$2,927
TOTAL IMPLEMENTED $26,426 $24,043 $23,667
239,743
kWh
$2,759
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs