169,430
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD0466 #01 Y:1995 | 01 | 1995 | Install compressor air intakes in coolest locations | $627 | $1,000 | |
| GT0561 #06 Y:1995 | 06 | 1995 | Use adjustable frequency drive or multiple speed motors on existing system | $45,730 | $201,600 | |
| GT0561 #05 Y:1995 | 05 | 1995 | Use screening, magnetic separation to remove contaminants | $349,805 | $1,000,000 | |
| GT0561 #04 Y:1995 | 04 | 1995 | Utilize energy-efficient belts and other improved mechanisms | $1,950 | $4,550 | |
| GT0561 #03 Y:1995 | 03 | 1995 | Change product design to reduce energy requirements | $99,420 | - | |
| GT0561 #02 Y:1995 | 02 | 1995 | Use waste heat from hot flue gases to preheat | $166,370 | $235,000 | |
| GT0561 #01 Y:1995 | 01 | 1995 | Purchase gas directly from a contract gas supplier | $473,300 | $1,050,000 | |
| AR0064 #12 Y:1995 | 12 | 1995 | Minimize water usage | $1,104 | $100 | |
| AR0064 #11 Y:1995 | 11 | 1995 | Install adequate dryers on air lines to eliminate blowdown | $2,776 | $1,750 | |
| AR0064 #10 Y:1995 | 10 | 1995 | Recover heat from exhausted steam, hot air or hot water | $53,591 | $4,900 | |
| AR0064 #09 Y:1995 | 09 | 1995 | Use adjustable frequency drive or multiple speed motors on existing system | $1,852 | $3,000 | |
| AR0064 #08 Y:1995 | 08 | 1995 | Install / repair insulation on steam lines | $4,142 | $822 | |
| AR0064 #07 Y:1995 | 07 | 1995 | Install compressor air intakes in coolest locations | $3,884 | $800 | |
| AR0064 #06 Y:1995 | 06 | 1995 | Use most efficient type of electric motors | $6,972 | $12,040 | |
| AR0064 #05 Y:1995 | 05 | 1995 | Utilize energy-efficient belts and other improved mechanisms | $1,431 | - | |
| AR0064 #04 Y:1995 | 04 | 1995 | Reduce illumination to minimum necessary levels | $9,234 | $1,320 | |
| AR0064 #03 Y:1995 | 03 | 1995 | Utilize higher efficiency lamps and/or ballasts | $892 | $416 | |
| AR0064 #02 Y:1995 | 02 | 1995 | Analyze flue gas for proper air/fuel ratio | $694 | $1,000 | |
| AR0064 #01 Y:1995 | 01 | 1995 | Eliminate leaks in inert gas and compressed air lines/ valves | $12,704 | $500 | |
| UM0035 #04 Y:1995 | 04 | 1995 | Improve air circulation with destratification fans / other methods | $6,138 | $6,000 |