| Assessment Year | 1995 |
|---|---|
| Principal Product | fabricated structural steel/plate weldments |
| NAICS |
n/a
|
| SIC | 3441: Fabricated Structural Metal |
| Sales Range | $10 M to 50M |
| # of Employees | 146 |
| Plant Area |
135,000
ft2
|
| Annual Production | 9,500
ton
|
| Production Hrs. Annual | 4,800
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $186,978 | 2,770,223 |
kWh
|
$0.067 |
| Natural Gas | $55,690 | 11,656 |
MMBtu
|
$4.78 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $6,535 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4221: Install compressor air intakes in coolest locations | $627 | $1,000 |
$627
29,894
kWh
|
- | |
| 02 | 2.2437: Recover waste heat from equipment | $2,867 | $3,000 | - |
$2,867
-
MMBtu
|
|
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,108 | $1,530 |
$1,108
18,464
kWh
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $816 | $960 |
$816
13,482
kWh
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,117 | $640 |
$1,117
15,240
kWh
|
- | |
| TOTAL RECOMMENDED | $6,535 | $7,130 |
$3,668
77,080
kWh
|
$2,867
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs