ITAC Assessment: UD0466
ITAC logo
ITAC Assessment: UD0466
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product fabricated structural steel/plate weldments
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 146
Plant Area 135,000
ft2
Annual Production 9,500
ton
Production Hrs. Annual 4,800
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $186,978 2,770,223
kWh
Natural Gas $55,690 11,656
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,535 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $627 $1,000 $627
29,894
kWh
-
02 2.2437: Recover waste heat from equipment $2,867 $3,000 - $2,867
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,108 $1,530 $1,108
18,464
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $816 $960 $816
13,482
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,117 $640 $1,117
15,240
kWh
-
TOTAL RECOMMENDED $6,535 $7,130 $3,668
77,080
kWh
$2,867
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs