Assessment Year | 1995 |
---|---|
Principal Product | Kaolin |
NAICS |
n/a
|
SIC | 3295: Minerals and Earths, Ground or Otherwise Treated |
Sales Range | $10 M to 50M |
# of Employees | 416 |
Plant Area |
500,000
ft2
|
Annual Production | 400,000
ton
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,293,519 | 66,398,887 |
kWh
|
$0.035 |
Natural Gas | $2,752,965 | 892,057 |
MMBtu
|
$3.09 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $1,136,575 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $520,980 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.8113: Purchase gas directly from a contract gas supplier | $473,300 | $1,050,000 | - | - | - | $473,300 | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $166,370 | $235,000 | - |
$166,370
-
MMBtu
|
- | - | |
03 | 2.5195: Change product design to reduce energy requirements | $99,420 | - | - |
$99,420
-
MMBtu
|
- | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,950 | $4,550 |
$1,950
83,822
kWh
|
- | - | - | |
05 | 3.3121: Use screening, magnetic separation to remove contaminants | $349,805 | $1,000,000 |
$90,430
1,793,669
kWh
|
- |
$259,375
-
lb
|
- | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $45,730 | $201,600 |
$45,730
1,099,648
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $1,136,575 | $2,491,150 |
$138,110
2,977,139
kWh
|
$265,790
-
MMBtu
|
$259,375
-
lb
|
$473,300 | ||
TOTAL IMPLEMENTED | $520,980 | $1,256,150 |
$47,680
1,183,470
kWh
|
- | - | $473,300 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs