ITAC Assessment: GT0561
ITAC logo
ITAC Assessment: GT0561
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Kaolin
NAICS
n/a
SIC 3295: Minerals and Earths, Ground or Otherwise Treated
Sales Range $10
M
to 50
M
# of Employees 416
Plant Area 500,000
ft2
Annual Production 400,000
ton
Production Hrs. Annual 8,400
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,293,519 66,398,887
kWh
Natural Gas $2,752,965 892,057
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,136,575 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $520,980

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.8113: Purchase gas directly from a contract gas supplier $473,300 $1,050,000 - - - $473,300
02 2.2414: Use waste heat from hot flue gases to preheat $166,370 $235,000 - $166,370
-
MMBtu
- -
03 2.5195: Change product design to reduce energy requirements $99,420 - - $99,420
-
MMBtu
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,950 $4,550 $1,950
83,822
kWh
- - -
05 3.3121: Use screening, magnetic separation to remove contaminants $349,805 $1,000,000 $90,430
1,793,669
kWh
- $259,375
-
lb
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $45,730 $201,600 $45,730
1,099,648
kWh
- - -
TOTAL RECOMMENDED $1,136,575 $2,491,150 $138,110
2,977,139
kWh
$265,790
-
MMBtu
$259,375
-
lb
$473,300
TOTAL IMPLEMENTED $520,980 $1,256,150 $47,680
1,183,470
kWh
- - $473,300
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs