ITAC Assessment: UM0035
ITAC logo
ITAC Assessment: UM0035
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product pumps
NAICS
n/a
SIC 3561: Pumps and Pumping Equipment
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 60,000
ft2
Annual Production 100,000
lb
Production Hrs. Annual 4,200
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $82,697 770,223
kWh
Natural Gas $21,982 4,273
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,710 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,992

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $2,152 $1,783 $2,152
20,223
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,840 $13,508 $5,840
54,513
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $580 $600 $580
5,569
kWh
-
04 2.7243: Improve air circulation with destratification fans / other methods $6,138 $6,000 - $6,138
-
MMBtu
TOTAL RECOMMENDED $14,710 $21,891 $8,572
80,305
kWh
$6,138
-
MMBtu
TOTAL IMPLEMENTED $7,992 $15,291 $7,992
74,736
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs