ITAC Assessment: RU0130
ITAC logo
ITAC Assessment: RU0130
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product GLUE AND ADHESIVE
NAICS
n/a
SIC 2891: Adhesives and Sealants
Sales Range $50
M
to 100
M
# of Employees 104
Plant Area
n/a
Annual Production 19,072
ton
Production Hrs. Annual 7,056
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $360,444 4,354,045
kWh
Natural Gas $22,234 4,160
MMBtu
Fuel Oil #6 $307,674 93,936
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,485 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $54,485

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,286 $303 $1,286
15,533
kWh
- -
02 2.7111: Reduce illumination to minimum necessary levels $3,789 - $3,789
45,721
kWh
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,167 - $5,167
62,427
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $2,608 $257 $2,608
31,653
kWh
- -
05 2.2414: Use waste heat from hot flue gases to preheat $40,632 $16,500 - - $40,632
-
MMBtu
06 2.1233: Analyze flue gas for proper air/fuel ratio $1,003 $500 - $1,003
-
MMBtu
-
TOTAL RECOMMENDED $54,485 $17,560 $12,850
155,334
kWh
$1,003
-
MMBtu
$40,632
-
MMBtu
TOTAL IMPLEMENTED $54,485 $17,560 $12,850
155,334
kWh
$1,003
-
MMBtu
$40,632
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs