Assessment Year | 1991 |
---|---|
Principal Product | GLUE AND ADHESIVE |
NAICS |
n/a
|
SIC | 2891: Adhesives and Sealants |
Sales Range | $50 M to 100M |
# of Employees | 104 |
Plant Area |
n/a
|
Annual Production | 19,072
ton
|
Production Hrs. Annual | 7,056
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $360,444 | 4,354,045 |
kWh
|
$0.083 |
Natural Gas | $22,234 | 4,160 |
MMBtu
|
$5.34 |
Fuel Oil #6 | $307,674 | 93,936 |
MMBtu
|
$3.28 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $54,485 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $54,485 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #6 Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,286 | $303 |
$1,286
15,533
kWh
|
- | - | |
02 | 2.7111: Reduce illumination to minimum necessary levels | $3,789 | - |
$3,789
45,721
kWh
|
- | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,167 | - |
$5,167
62,427
kWh
|
- | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $2,608 | $257 |
$2,608
31,653
kWh
|
- | - | |
05 | 2.2414: Use waste heat from hot flue gases to preheat | $40,632 | $16,500 | - | - |
$40,632
-
MMBtu
|
|
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,003 | $500 | - |
$1,003
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $54,485 | $17,560 |
$12,850
155,334
kWh
|
$1,003
-
MMBtu
|
$40,632
-
MMBtu
|
||
TOTAL IMPLEMENTED | $54,485 | $17,560 |
$12,850
155,334
kWh
|
$1,003
-
MMBtu
|
$40,632
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #6 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs