ITAC Assessment: MA0305
ITAC logo
ITAC Assessment: MA0305
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product fact booklets
NAICS
n/a
SIC 2731: Books: Publishing, or Publishing and Printing
Sales Range $10
M
to 50
M
# of Employees 260
Plant Area 97,621
ft2
Annual Production 1,400,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $244,829 1,659,437
kWh
Natural Gas $51,604 9,235
MMBtu
Fuel Oil #2 $9,525 2,100
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $75,924 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,462

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings
01 2.2437: Recover waste heat from equipment $18,419 $10,078 - $18,419
-
MMBtu
- - -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,978 $14,015 $4,978
55,393
kWh
- - - -
03 2.7424: Shade windows from summer sun $15,022 $41,394 $15,022
588,511
kWh
- - - -
04 2.7231: Use radiant heater for spot heating $1,508 $5,569 - - $1,508
-
MMBtu
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $698 - $698
7,913
kWh
- - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $764 $180 $764
8,499
kWh
- - - -
07 3.5121: Recycle waste ink and cleanup solvent $24,185 $2,500 - - - $24,185
-
gal
-
08 3.6193: Install equipment (eg compactor) to reduce disposal costs $10,350 $385 - - - - $10,350
-
lb
TOTAL RECOMMENDED $75,924 $74,121 $21,462
660,316
kWh
$18,419
-
MMBtu
$1,508
-
MMBtu
$24,185
-
gal
$10,350
-
lb
TOTAL IMPLEMENTED $1,462 $180 $1,462
16,412
kWh
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs