Assessment Year 1995
Principal Product Pipe Fittings
NAICS
n/a
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area 26,000
ft2
Annual Production 0
lb
Production Hrs. Annual 96,000
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $70,642 901,524
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,641 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,707

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $19,345 $11,900 $24,727
315,358
kWh
$(-5,382.0)
-
MMBtu
02 2.4133: Use most efficient type of electric motors $1,483 $3,900 $1,483
19,050
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $997 $1,279 $997
12,603
kWh
-
04 2.7135: Install occupancy sensors $362 $300 $362
4,689
kWh
-
05 2.7111: Reduce illumination to minimum necessary levels $112 $100 $112
1,465
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $140 $110 $140
1,758
kWh
-
07 2.4221: Install compressor air intakes in coolest locations $202 $200 $202
2,638
kWh
-
TOTAL RECOMMENDED $22,641 $17,789 $28,023
357,561
kWh
$(-5,382.0)
-
MMBtu
TOTAL IMPLEMENTED $19,707 $12,200 $25,089
320,047
kWh
$(-5,382.0)
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs