ITAC Assessment: WV0085
ITAC logo
ITAC Assessment: WV0085
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Boiler tubular panels
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 180,000
ft2
Annual Production 2,500
ton
Production Hrs. Annual 4,160
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $35,378 925,264
kWh
Electricity Demand $64,168 3,495
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,865 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,685

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $962 $6,073 $962
22,274
kWh
- -
02 2.4133: Use most efficient type of electric motors $779 $3,050 $779
18,171
kWh
- -
03 2.4314: Use synthetic lubricant $250 $400 $250
5,569
kWh
- -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $9,694 $500 - $9,694
-
kW-mo/yr
-
05 3.4111: Use closed cycle process to minimize waste water production $9,180 $9,200 $(-420.0)
(-9,672)
kWh
- $9,600
-
Tgal
TOTAL RECOMMENDED $20,865 $19,223 $1,571
36,342
kWh
$9,694
-
kW-mo/yr
$9,600
-
Tgal
TOTAL IMPLEMENTED $11,685 $10,023 $1,991
46,014
kWh
$9,694
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs