Assessment Year | 2024 |
---|---|
Principal Product | Lead Acid Batteries |
NAICS | 335911: Storage Battery Manufacturing |
SIC | 3691: Storage Batteries |
Sales Range | $100 M to 500M |
# of Employees | 175 |
Plant Area |
39,130
ft2
|
Annual Production | 1,600,000
pieces
|
Production Hrs. Annual | 6,912
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $1,224,576 | 8,356,868 |
kWh
|
$0.15 | |
Electricity Demand | $395,117 | 15,802 |
kW-mo/yr
|
$25.00 | |
Electricity Fees | $(-10,190.0) | - |
|
- | |
Natural Gas | $761,522 | 115,157 |
MMBtu
|
$6.61 | |
Waste Disposal Costs | |||||
Water Usage | $20,435 | 3,104 |
Tgal
|
$6.58 | |
TOTAL YEARLY COSTS | $2,391,460 | ||||
RECOMMENDED SAVINGS* | $809,472 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $400,041 | $153,000 |
$308,216
2,103,863
kWh
|
$91,825
-
kW-mo/yr
|
- | |
02 | 2.1321: Replace fossil fuel equipment with electrical equipment | $209,556 | $50,000 |
$(-18,986.0)
(-129,600)
kWh
|
- |
$228,542
-
MMBtu
|
|
03 | 2.9114: Use solar heat to make electricty | $101,553 | $493,100 |
$80,553
549,850
kWh
|
$21,000
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $54,033 | $1,200 |
$42,658
291,179
kWh
|
$11,375
-
kW-mo/yr
|
- | |
05 | 2.2437: Recover waste heat from equipment | $36,628 | $24,000 | - | - |
$36,628
-
MMBtu
|
|
06 | 2.3132: Recharge batteries on during off-peak demand periods | $6,300 | $80 | - |
$6,300
-
kW-mo/yr
|
- | |
07 | 2.1321: Replace fossil fuel equipment with electrical equipment | $1,361 | $8,000 |
$(-1,367.0)
(-9,331)
kWh
|
- |
$2,728
-
MMBtu
|
|
TOTAL RECOMMENDED | $809,472 | $729,380 |
$411,074
2,805,961
kWh
|
$130,500
-
kW-mo/yr
|
$267,898
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs