ITAC Assessment: WV0631
ITAC logo
ITAC Assessment: WV0631
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Water Treatment
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $1
M
to 5
M
# of Employees 17
Plant Area 23,000
ft2
Annual Production 510,813
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $154,285 2,546,957
kWh
Electricity Demand $43,867 4,158
kW-mo/yr
Natural Gas $1,431 248
MMBtu
TOTAL YEARLY COSTS $199,583
RECOMMENDED SAVINGS* $69,216 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,165

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.4322: Use or replace with energy efficient substitutes $30,923 $89,840 $24,973
412,101
kWh
$5,950
-
kW-mo/yr
-
02 2.5195: Change product design to reduce energy requirements $22,924 $32,450 $18,514
305,504
kWh
$4,410
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $11,513 $4,998 $9,002
148,543
kWh
$2,511
-
kW-mo/yr
-
04 2.4224: Upgrade controls on compressors $2,204 $1,911 $1,708
28,180
kWh
$496
-
kW-mo/yr
-
05 2.4151: Develop a repair/replace policy $1,092 $1,292 $939
15,491
kWh
$222
-
kW-mo/yr
$(-69.0)
06 2.4157: Establish a predictive maintenance program $560 $1,500 $1,001
16,524
kWh
$243
-
kW-mo/yr
$(-684.0)
TOTAL RECOMMENDED $69,216 $131,991 $56,137
926,343
kWh
$13,832
-
kW-mo/yr
$(-753.0)
TOTAL IMPLEMENTED $13,165 $7,790 $10,942
180,558
kWh
$2,976
-
kW-mo/yr
$(-753.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs