Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

168,212

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TN0552 #03 Y:1995 Minimize condenser cooling water temperature $2,137 -
TN0552 #02 Y:1995 Air condition only space necessary $7,953 -
TN0552 #01 Y:1995 Lower temperature during the winter season and vice-versa $21,410 -
ND0220 #08 Y:1995 Turn off equipment when not in use $87 -
ND0220 #07 Y:1995 Close holes and openings in building such as broken windows $117 $70
ND0220 #06 Y:1995 Utilize higher efficiency lamps and/or ballasts $127 $190
ND0220 #05 Y:1995 Install compressor air intakes in coolest locations $341 $100
ND0220 #04 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $1,167 $400
ND0220 #03 Y:1995 Utilize higher efficiency lamps and/or ballasts $1,400 $374
ND0220 #02 Y:1995 Optimize plant power factor $1,783 $2,145
ND0220 #01 Y:1995 Use most efficient type of electric motors $3,210 $2,390
KG0032 #05 Y:1995 Reduce the pressure of compressed air to the minimum required $636 $20
KG0032 #04 Y:1995 Install timers and/or thermostats $1,002 $600
KG0032 #03 Y:1995 Utilize higher efficiency lamps and/or ballasts $1,008 $383
KG0032 #02 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $3,180 $600
KG0032 #01 Y:1995 Use most efficient type of electric motors $4,023 $8,710
IA0116 #10 Y:1995 Change procedures / equipment / operating conditions $185 $300
IA0116 #09 Y:1995 Change procedures / equipment / operating conditions $3,431 $3,614
IA0116 #08 Y:1995 Lease / purchase baler; sell cardboard to recycler $11,090 $7,400
IA0116 #07 Y:1995 Close holes and openings in building such as broken windows $258 $392