ITAC Assessment: TN0552
ITAC logo
ITAC Assessment: TN0552
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Positron Emission tomographs
NAICS
n/a
SIC 3845: Electromedical and Electrotherapeutic Apparatus
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 114,000
ft2
Annual Production 14
pieces
Production Hrs. Annual 2,040
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $197,061 3,622,802
kWh
Natural Gas $13,568 1,826
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,206 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,177

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7221: Lower temperature during the winter season and vice-versa $21,410 - $21,410
713,658
kWh
-
02 2.7229: Air condition only space necessary $7,953 - $7,953
238,863
kWh
-
03 2.2623: Minimize condenser cooling water temperature $2,137 - $2,137
71,219
kWh
-
04 2.7144: Install spectral reflectors / delamp $3,312 - $3,312
60,082
kWh
-
05 2.7243: Improve air circulation with destratification fans / other methods $607 $1,700 - $607
-
MMBtu
06 2.7124: Make a practice of turning off lights when not needed $318 - $318
10,551
kWh
-
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $11,469 - $11,469
-
kWh
-
TOTAL RECOMMENDED $47,206 $1,700 $46,599
1,094,373
kWh
$607
-
MMBtu
TOTAL IMPLEMENTED $27,177 - $27,177
855,510
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs