Assessment Year | 2010 |
---|---|
Principal Product | Pumps\Valves\Parts |
NAICS | 333911: Pump and Pumping Equipment Manufacturing |
SIC | 3561: Pumps and Pumping Equipment |
Sales Range | $100 M to 500M |
# of Employees | 350 |
Plant Area |
286,420
ft2
|
Annual Production | 3,033
units
|
Production Hrs. Annual | 4,560
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $345,651 | 6,133,609 |
kWh
|
$0.056 |
Electricity Demand | $99,449 | 32,451 |
kW-mo/yr
|
$3.06 |
Electricity Fees | $29,607 | - |
|
- |
Natural Gas | $213,690 | 16,356 |
MMBtu
|
$13.06 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $170,127 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $51,337 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,380 | $1,500 |
$4,380
74,460
kWh
|
- | - | |
02 | 2.4314: Use synthetic lubricant | $4,585 | - |
$4,222
71,800
kWh
|
$363
-
kW-mo/yr
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $899 | $1,555 |
$828
14,074
kWh
|
$71
-
kW-mo/yr
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $43,718 | $121,175 |
$40,257
684,644
kWh
|
$3,461
-
kW-mo/yr
|
- | |
05 | 2.7135: Install occupancy sensors | $2,340 | $2,940 |
$2,340
39,795
kWh
|
- | - | |
06 | 2.2443: Re-use or recycle hot or cold process exhaust air | $114,205 | $196,875 | - | - |
$114,205
-
MMBtu
|
|
TOTAL RECOMMENDED | $170,127 | $324,045 |
$52,027
884,773
kWh
|
$3,895
-
kW-mo/yr
|
$114,205
-
MMBtu
|
||
TOTAL IMPLEMENTED | $51,337 | $127,170 |
$47,805
812,973
kWh
|
$3,532
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs