ITAC Assessment: GT0875
ITAC logo
ITAC Assessment: GT0875
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Pumps\Valves\Parts
NAICS 333911: Pump and Pumping Equipment Manufacturing
SIC 3561: Pumps and Pumping Equipment
Sales Range $100
M
to 500
M
# of Employees 350
Plant Area 286,420
ft2
Annual Production 3,033
units
Production Hrs. Annual 4,560
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $345,651 6,133,609
kWh
Electricity Demand $99,449 32,451
kW-mo/yr
Electricity Fees $29,607 -
Natural Gas $213,690 16,356
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $170,127 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $51,337

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,380 $1,500 $4,380
74,460
kWh
- -
02 2.4314: Use synthetic lubricant $4,585 - $4,222
71,800
kWh
$363
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $899 $1,555 $828
14,074
kWh
$71
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $43,718 $121,175 $40,257
684,644
kWh
$3,461
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $2,340 $2,940 $2,340
39,795
kWh
- -
06 2.2443: Re-use or recycle hot or cold process exhaust air $114,205 $196,875 - - $114,205
-
MMBtu
TOTAL RECOMMENDED $170,127 $324,045 $52,027
884,773
kWh
$3,895
-
kW-mo/yr
$114,205
-
MMBtu
TOTAL IMPLEMENTED $51,337 $127,170 $47,805
812,973
kWh
$3,532
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs