ITAC Assessment: UA0069
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Polyurethane Car Parts
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 107
Plant Area 176,000
ft2
Annual Production 900,000
pieces
Production Hrs. Annual 6,935
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $518,677 12,096,000
kWh
Natural Gas $136,830 11,323
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $64,346 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,865

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,023 $800 $1,032
24,072
kWh
$(-9.0) -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,441 $800 $3,470
80,914
kWh
$(-29.0) -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,126 $1,300 $1,136
26,482
kWh
$(-10.0) -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,916 $3,200 $1,932
45,045
kWh
$(-16.0) -
05 2.2437: Recover waste heat from equipment $678 $2,578 $684
15,960
kWh
$(-6.0) -
06 2.2515: Use optimum thickness insulation $25,829 $16,900 $27,520
641,799
kWh
$(-219.0) $(-1,472.6)
-
MMBtu
07 2.2515: Use optimum thickness insulation $5,314 $1,750 $5,662
132,035
kWh
$(-45.0) $(-303.0)
-
MMBtu
08 2.2515: Use optimum thickness insulation $6,558 $7,600 $6,988
162,969
kWh
$(-56.0) $(-373.9)
-
MMBtu
09 2.7142: Utilize higher efficiency lamps and/or ballasts $17,865 $24,690 $18,016
420,150
kWh
$(-151.0) -
10 2.7135: Install occupancy sensors $596 $398 $601
14,034
kWh
$(-5.0) -
TOTAL RECOMMENDED $64,346 $60,016 $67,041
1,563,460
kWh
$(-546.0) $(-2,149.5)
-
MMBtu
TOTAL IMPLEMENTED $17,865 $24,690 $18,016
420,150
kWh
$(-151.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs