ITAC Assessment: KG0032
ITAC logo
ITAC Assessment: KG0032
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Structural steel fabrication;metal doors & door frames; pref
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 110,000
ft2
Annual Production 7,000
ton
Production Hrs. Annual 3,146
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,262 673,212
kWh
Natural Gas $1,759 583
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,849 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,188

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $4,023 $8,710 $4,023
153,576
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,180 $600 $3,180
36,342
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,008 $383 $1,008
9,965
kWh
04 2.7261: Install timers and/or thermostats $1,002 $600 $1,002
29,894
kWh
05 2.4231: Reduce the pressure of compressed air to the minimum required $636 $20 $636
9,672
kWh
TOTAL RECOMMENDED $9,849 $10,313 $9,849
239,449
kWh
TOTAL IMPLEMENTED $4,188 $983 $4,188
46,307
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs