ITAC Assessment: ND0220
ITAC logo
ITAC Assessment: ND0220
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product wood crates
NAICS
n/a
SIC 2441: Nailed and Lock Corner Wood Boxes and Shook
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 65,000
ft2
Annual Production 17,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,761 513,189
kWh
Natural Gas $11,349 2,324
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,232 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,112

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $3,210 $2,390 $3,210
51,876
kWh
-
02 2.3212: Optimize plant power factor $1,783 $2,145 $1,783
-
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,400 $374 $1,400
22,567
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,167 $400 $1,167
18,757
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $341 $100 $341
5,569
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $127 $190 $127
2,052
kWh
-
07 2.7444: Close holes and openings in building such as broken windows $117 $70 - $117
-
MMBtu
08 2.6218: Turn off equipment when not in use $87 - $87
1,465
kWh
-
TOTAL RECOMMENDED $8,232 $5,669 $8,115
102,286
kWh
$117
-
MMBtu
TOTAL IMPLEMENTED $3,112 $944 $2,995
48,358
kWh
$117
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs