ITAC Assessment: IA0163
ITAC logo
ITAC Assessment: IA0163
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product concrete forms
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $50
M
to 100
M
# of Employees 185
Plant Area 395,000
ft2
Annual Production 19,000,000
lb
Production Hrs. Annual 4,335
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $89,004 3,587,339
kWh
Electricity Demand $64,477 11,304
kW-mo/yr
Natural Gas $69,230 9,981
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,261,967 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $73,725

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Increase in Production Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $1,000,711 $120,000 - - - $(-115,711.0) - $1,116,422
02 4.111: Add equipment/ operators to reduce production bottleneck $186,892 $520,000 $(-1,553.0)
(-62,134)
kWh
$(-1,385.0)
-
kW-mo/yr
- $189,830 - -
03 4.111: Add equipment/ operators to reduce production bottleneck $56,975 $1,550 - - - $56,975 - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $8,339 $45,630 $3,506
140,094
kWh
$4,833
-
kW-mo/yr
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $389 $864 $147
5,862
kWh
$242
-
kW-mo/yr
- - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,715 $563 $3,022
120,750
kWh
$2,693
-
kW-mo/yr
- - - -
07 3.5315: Lease / purchase baler; sell cardboard to recycler $2,696 $7,000 - - $2,696
-
lb
- - -
08 3.1161: Eliminate/reduce an operation $130 - - - - - $130 -
09 3.5316: Contract a wood pallet recycling company $120 - - - $120
-
lb
- - -
TOTAL RECOMMENDED $1,261,967 $695,607 $5,122
204,572
kWh
$6,383
-
kW-mo/yr
$2,816
-
lb
$131,094 $130 $1,116,422
TOTAL IMPLEMENTED $73,725 $54,743 $6,528
260,844
kWh
$7,526
-
kW-mo/yr
$2,696
-
lb
$56,975 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs