ITAC Assessment: IA0116
ITAC logo
ITAC Assessment: IA0116
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product car caddies and trailors
NAICS
n/a
SIC 3799: Transportation Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 200,000
ft2
Annual Production 7,000
pieces
Production Hrs. Annual 5,226
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $122,135 2,847,304
kWh
Natural Gas $49,019 14,026
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $64,617 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,285

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $28,462 $66,000 $54,595
1,272,861
kWh
$(-26,133.0)
-
MMBtu
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,093 $400 $3,093
72,098
kWh
- - -
03 2.4221: Install compressor air intakes in coolest locations $561 $25 $561
13,189
kWh
- - -
04 2.7135: Install occupancy sensors $2,771 $3,555 $2,771
64,478
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,384 $520 $1,384
32,239
kWh
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $13,382 $51,892 $13,382
312,134
kWh
- - -
07 2.7444: Close holes and openings in building such as broken windows $258 $392 - $258
-
MMBtu
- -
08 3.5315: Lease / purchase baler; sell cardboard to recycler $11,090 $7,400 - - $11,090
-
lb
-
09 3.1191: Change procedures / equipment / operating conditions $3,431 $3,614 - - - $3,431
-
lb
10 3.1191: Change procedures / equipment / operating conditions $185 $300 - - $185
-
lb
-
TOTAL RECOMMENDED $64,617 $134,098 $75,786
1,766,999
kWh
$(-25,875.0)
-
MMBtu
$11,275
-
lb
$3,431
-
lb
TOTAL IMPLEMENTED $56,285 $126,084 $71,070
1,657,093
kWh
$(-25,875.0)
-
MMBtu
$11,090
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs