Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

167,595

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
ND0215 #02 Y:1995 Substitute compressed air cooling with water or air cooling $8,721 $200
ND0215 #01 Y:1995 Turn off equipment when not in use $144 -
NC0057 #05 Y:1995 Use cooling tower or economizer to replace chiller cooling $9,881 $10,000
NC0057 #04 Y:1995 Utilize higher efficiency lamps and/or ballasts $680 $984
NC0057 #03 Y:1995 Insulate bare equipment $415 $250
NC0057 #02 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $142 $180
NC0057 #01 Y:1995 Provide proper maintenance of motor driven equipment $7,069 -
MS0028 #05 Y:1995 Close holes and openings in building such as broken windows $225 $100
MS0028 #04 Y:1995 Install timers and/or thermostats $1,146 $1,050
MS0028 #03 Y:1995 Install timers and/or thermostats $3,234 $450
MS0028 #02 Y:1995 Use most efficient type of electric motors $2,151 $16,575
MS0028 #01 Y:1995 Utilize higher efficiency lamps and/or ballasts $2,307 $3,535
MO0151 #05 Y:1995 Use plastic pallets instead of wood $38,520 $36,113
MO0151 #04 Y:1995 Replace city water with recycled water via cooling tower $9,918 $2,845
MO0151 #03 Y:1995 Reduce the pressure of compressed air to the minimum required $530 $25
MO0151 #02 Y:1995 Utilize higher efficiency lamps and/or ballasts $4,472 $15,370
MO0151 #01 Y:1995 Use radiant heater for spot heating $27,601 $17,901
AR0055 #06 Y:1995 Recover and reuse waste material $86,461 $51,250
AR0055 #05 Y:1995 Reduce illumination to minimum necessary levels $451 $30
AR0055 #04 Y:1995 Install compressor air intakes in coolest locations $259 $200