| Assessment Year | 1995 |
|---|---|
| Principal Product | Hardwood Flooring |
| NAICS |
n/a
|
| SIC | 2426: Hardwood Dimension and Flooring Mills |
| Sales Range | $5 M to 10M |
| # of Employees | 65 |
| Plant Area |
136,610
ft2
|
| Annual Production | 4,000
thousand feet
|
| Production Hrs. Annual | 2,086
hrs
|
| Location (State) | Arkansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $191,716 | 1,907,972 |
kWh
|
$0.10 |
| Natural Gas | $14,380 | 3,774 |
MMBtu
|
$3.81 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $159,055 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $104,271 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Liquid (haz) Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,500 | $438 |
$1,500
12,603
kWh
|
- | - | - | |
| 02 | 2.7111: Reduce illumination to minimum necessary levels | $1,881 | $17 |
$1,881
12,603
kWh
|
- | - | - | |
| 03 | 2.4133: Use most efficient type of electric motors | $3,188 | $8,450 |
$3,188
25,205
kWh
|
- | - | - | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,333 | - |
$3,333
43,376
kWh
|
- | - | - | |
| 05 | 2.8114: Change rate schedules or other changes in utility service | $54,784 | $6,000 | - | - | - | $54,784 | |
| 06 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $20,783 | $5,600 |
$21,295
112,544
kWh
|
$(-512.0)
-
MMBtu
|
- | - | |
| 07 | 3.1191: Change procedures / equipment / operating conditions | $73,586 | $1,500 | - | - |
$73,586
-
gal
|
- | |
| TOTAL RECOMMENDED | $159,055 | $22,005 |
$31,197
206,331
kWh
|
$(-512.0)
-
MMBtu
|
$73,586
-
gal
|
$54,784 | ||
| TOTAL IMPLEMENTED | $104,271 | $16,005 |
$31,197
206,331
kWh
|
$(-512.0)
-
MMBtu
|
$73,586
-
gal
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Liquid (haz) Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs