ITAC Assessment: AR0057
ITAC logo
ITAC Assessment: AR0057
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Hardwood Flooring
NAICS
n/a
SIC 2426: Hardwood Dimension and Flooring Mills
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area 136,610
ft2
Annual Production 4,000
thousand feet
Production Hrs. Annual 2,086
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $191,716 1,907,972
kWh
Natural Gas $14,380 3,774
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $159,055 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $104,271

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,500 $438 $1,500
12,603
kWh
- - -
02 2.7111: Reduce illumination to minimum necessary levels $1,881 $17 $1,881
12,603
kWh
- - -
03 2.4133: Use most efficient type of electric motors $3,188 $8,450 $3,188
25,205
kWh
- - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,333 - $3,333
43,376
kWh
- - -
05 2.8114: Change rate schedules or other changes in utility service $54,784 $6,000 - - - $54,784
06 2.2449: Recover heat from exhausted steam, hot air or hot water $20,783 $5,600 $21,295
112,544
kWh
$(-512.0)
-
MMBtu
- -
07 3.1191: Change procedures / equipment / operating conditions $73,586 $1,500 - - $73,586
-
gal
-
TOTAL RECOMMENDED $159,055 $22,005 $31,197
206,331
kWh
$(-512.0)
-
MMBtu
$73,586
-
gal
$54,784
TOTAL IMPLEMENTED $104,271 $16,005 $31,197
206,331
kWh
$(-512.0)
-
MMBtu
$73,586
-
gal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Liquid (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs