ITAC Assessment: MS0031
ITAC logo
ITAC Assessment: MS0031
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product plastic products
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 215,000
ft2
Annual Production 10,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $158,842 5,053,341
kWh
Natural Gas $11,860 1,722
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,167 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $598 $900 $598
-
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,832 $3,975 $1,832
40,445
kWh
-
03 2.7134: Use photocell controls $1,318 $3,598 $1,318
43,376
kWh
-
04 2.2511: Insulate bare equipment $2,426 $21,500 $2,426
80,012
kWh
-
05 2.4323: Use optimum size and capacity equipment $1,391 $500 $1,391
31,360
kWh
-
06 2.6214: Shut off pilots in standby equipment $602 $20 - $602
-
MMBtu
TOTAL RECOMMENDED $8,167 $30,493 $7,565
195,193
kWh
$602
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs