Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

167,639

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UL0130 #03 Y:1995 Optimize plant power factor $11,418 $5,400
UL0130 #02 Y:1995 Utilize higher efficiency lamps and/or ballasts $3,808 $4,595
UL0130 #01 Y:1995 Reduce the pressure of compressed air to the minimum required $922 -
SD0127 #06 Y:1995 Install occupancy sensors $3,379 $2,569
SD0127 #05 Y:1995 Install spectral reflectors / delamp $11,158 $13,280
SD0127 #04 Y:1995 Utilize higher efficiency lamps and/or ballasts $5,145 $7,922
SD0127 #03 Y:1995 Reduce the pressure of compressed air to the minimum required $914 $16
SD0127 #02 Y:1995 Use cooling tower water instead of refrigeration $18,822 $32,000
SD0127 #01 Y:1995 Use most efficient type of electric motors $3,637 $5,890
NC0058 #09 Y:1995 Insulate bare equipment $4,862 $1,500
NC0058 #08 Y:1995 Reschedule plant operations or reduce load to avoid peaks $13,702 -
NC0058 #07 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $11,975 $240
NC0058 #06 Y:1995 Avoid introducing hot, humid, or dirty air into hvac system $20,246 $4,000
NC0058 #05 Y:1995 Use adjustable frequency drive or multiple speed motors on existing system $1,618 $2,500
NC0058 #04 Y:1995 Make ice during off peak hours for cooling $19,158 $80,000
NC0058 #03 Y:1995 Use cooling tower or economizer to replace chiller cooling $3,940 $10,000
NC0058 #02 Y:1995 Use most efficient type of electric motors $16,902 $30,410
NC0058 #01 Y:1995 Utilize higher efficiency lamps and/or ballasts $149 $292
MS0030 #07 Y:1995 Shut off pilots in standby equipment $125 $20
MS0030 #06 Y:1995 Replace electrically-operated equipment with fossil fuel equipment $957 $800