167,639
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UL0130 #03 Y:1995 | 03 | 1995 | Optimize plant power factor | $11,418 | $5,400 | |
| UL0130 #02 Y:1995 | 02 | 1995 | Utilize higher efficiency lamps and/or ballasts | $3,808 | $4,595 | |
| UL0130 #01 Y:1995 | 01 | 1995 | Reduce the pressure of compressed air to the minimum required | $922 | - | |
| SD0127 #06 Y:1995 | 06 | 1995 | Install occupancy sensors | $3,379 | $2,569 | |
| SD0127 #05 Y:1995 | 05 | 1995 | Install spectral reflectors / delamp | $11,158 | $13,280 | |
| SD0127 #04 Y:1995 | 04 | 1995 | Utilize higher efficiency lamps and/or ballasts | $5,145 | $7,922 | |
| SD0127 #03 Y:1995 | 03 | 1995 | Reduce the pressure of compressed air to the minimum required | $914 | $16 | |
| SD0127 #02 Y:1995 | 02 | 1995 | Use cooling tower water instead of refrigeration | $18,822 | $32,000 | |
| SD0127 #01 Y:1995 | 01 | 1995 | Use most efficient type of electric motors | $3,637 | $5,890 | |
| NC0058 #09 Y:1995 | 09 | 1995 | Insulate bare equipment | $4,862 | $1,500 | |
| NC0058 #08 Y:1995 | 08 | 1995 | Reschedule plant operations or reduce load to avoid peaks | $13,702 | - | |
| NC0058 #07 Y:1995 | 07 | 1995 | Eliminate leaks in inert gas and compressed air lines/ valves | $11,975 | $240 | |
| NC0058 #06 Y:1995 | 06 | 1995 | Avoid introducing hot, humid, or dirty air into hvac system | $20,246 | $4,000 | |
| NC0058 #05 Y:1995 | 05 | 1995 | Use adjustable frequency drive or multiple speed motors on existing system | $1,618 | $2,500 | |
| NC0058 #04 Y:1995 | 04 | 1995 | Make ice during off peak hours for cooling | $19,158 | $80,000 | |
| NC0058 #03 Y:1995 | 03 | 1995 | Use cooling tower or economizer to replace chiller cooling | $3,940 | $10,000 | |
| NC0058 #02 Y:1995 | 02 | 1995 | Use most efficient type of electric motors | $16,902 | $30,410 | |
| NC0058 #01 Y:1995 | 01 | 1995 | Utilize higher efficiency lamps and/or ballasts | $149 | $292 | |
| MS0030 #07 Y:1995 | 07 | 1995 | Shut off pilots in standby equipment | $125 | $20 | |
| MS0030 #06 Y:1995 | 06 | 1995 | Replace electrically-operated equipment with fossil fuel equipment | $957 | $800 |