Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

167,884

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
ND0220 #03 Y:1995 Utilize higher efficiency lamps and/or ballasts $1,400 $374
ND0220 #02 Y:1995 Optimize plant power factor $1,783 $2,145
ND0220 #01 Y:1995 Use most efficient type of electric motors $3,210 $2,390
KG0032 #05 Y:1995 Reduce the pressure of compressed air to the minimum required $636 $20
KG0032 #04 Y:1995 Install timers and/or thermostats $1,002 $600
KG0032 #03 Y:1995 Utilize higher efficiency lamps and/or ballasts $1,008 $383
KG0032 #02 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $3,180 $600
KG0032 #01 Y:1995 Use most efficient type of electric motors $4,023 $8,710
IA0116 #10 Y:1995 Change procedures / equipment / operating conditions $185 $300
IA0116 #09 Y:1995 Change procedures / equipment / operating conditions $3,431 $3,614
IA0116 #08 Y:1995 Lease / purchase baler; sell cardboard to recycler $11,090 $7,400
IA0116 #07 Y:1995 Close holes and openings in building such as broken windows $258 $392
IA0116 #06 Y:1995 Utilize higher efficiency lamps and/or ballasts $13,382 $51,892
IA0116 #05 Y:1995 Utilize higher efficiency lamps and/or ballasts $1,384 $520
IA0116 #04 Y:1995 Install occupancy sensors $2,771 $3,555
IA0116 #03 Y:1995 Install compressor air intakes in coolest locations $561 $25
IA0116 #02 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $3,093 $400
IA0116 #01 Y:1995 Replace electrically-operated equipment with fossil fuel equipment $28,462 $66,000
UD0463 #03 Y:1995 Utilize higher efficiency lamps and/or ballasts $13,335 $16,387
UD0463 #02 Y:1995 Use demand controller or load shedder $4,512 $12,000