ITAC Assessment: UD0463
ITAC logo
ITAC Assessment: UD0463
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product pressure sensitive labels, coating for packaging
NAICS
n/a
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 70,000
ft2
Annual Production 0
units
Production Hrs. Annual 7,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $248,074 4,342,907
kWh
Natural Gas $23,310 5,011
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,340 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4226: Use / purchase optimum sized compressor $493 - $493
23,740
kWh
- -
02 2.3191: Use demand controller or load shedder $4,512 $12,000 $4,512
-
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $13,335 $16,387 $14,365
252,052
kWh
$(-1,755.0)
-
MMBtu
$725
TOTAL RECOMMENDED $18,340 $28,387 $19,370
275,792
kWh
$(-1,755.0)
-
MMBtu
$725
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs